Skip to main content
Indicative design concept of the planned TEMCO hospital main entrance, latest iteration. An illustrative architectural concept of a structure yet to be built. Opening 2029.Indicative design concept
Centres of Excellence

Trauma, Orthopaedics and Dialysis · Opening 2029

When Minutes Matter, Care Is Close

A 24-hour emergency service anchored to the airport and the greater Gaborone catchment, orthopaedic surgery, a dialysis unit of around forty stations, and rehabilitation planned on the same campus. Opening 2029.

Kidney failure reorganises a life around a machine

Dialysis runs three times a week, every week, for as long as it is needed. A patient without a local slot either moves closer to one or spends a large part of every week travelling, and that arithmetic does not change with how well the patient is otherwise doing.

A planned unit of around forty stations adds real capacity, and it sits on a campus that also holds the imaging, the vascular surgery and the transplant workup that a renal patient comes to need. Beside it, a 24-hour emergency service and orthopaedic surgery are planned for the airport precinct and the communities around it, where the distance between an accident and a theatre is measured in minutes.

A surgeon in scrubs stands beneath the lights of an operating theatre.

The accident that needs a theatre in minutes arrives at a door with the theatre behind it.

Opening 2029

What is planned here

Every service below is planned and subject to regulatory approval. This centre adds capacity where demand is growing fastest, and it puts that capacity beside the imaging, the surgery and the follow-up that the same patients need.

Planned Services

  • 24-hour trauma and emergency care
  • Orthopaedic surgery
  • A dialysis unit of around forty stations
  • Rehabilitation and physiotherapy support
  • Imaging, vascular surgery and transplant workup on the same campus
  • An emergency service anchored to the airport and the greater Gaborone catchment

What this means for you

If you are on dialysis, a local slot means three sessions a week stop deciding where you live. If you need vascular access, imaging or a transplant workup, those sit on the same campus as the chair you dialyse in. If you arrive through the emergency doors after an accident, the theatre and the imaging are in the building you have arrived at.

A regional destination

Capacity added where the demand is growing

Renal replacement therapy is among the services the region is shortest of, and the one least able to wait, because a missed week is not a delayed appointment. Adding around forty stations in Gaborone puts capacity within reach of patients who are currently rationed by distance, and the emergency service beside it serves the airport precinct and the communities around it.

Talk to the clinical team

TEMCO is in development, with operations planned for 2029. If you are a patient planning renal care, or a clinician who would refer one, the coordination team will be in touch as services come online.

The information provided on this page is for general informational purposes only and is not a substitute for professional medical advice, diagnosis or treatment. Always seek the advice of a qualified healthcare provider. All services listed are planned and subject to regulatory approval. TEMCO Specialised General Hospital is expected to commence operations in 2029.