The Facility
A purpose-built specialised hospital at the Sir Seretse Khama International Airport Special Economic Zone.
Sir Seretse Khama International Airport SEZ
TEMCO is located within the Sir Seretse Khama International Airport Special Economic Zone in Gaborone, Botswana. The airport precinct provides strategic advantages for a specialised hospital: direct international patient access, established transport infrastructure and SEZA fiscal incentives that materially reduce operating costs.
The location serves the greater Gaborone metropolitan area while offering convenient access for regional SADC patients arriving by air. The Accident and Emergency department will serve both the airport catchment and surrounding communities.
Site Specifications
130
Bed Capacity
Specialist beds
7-11 ha
Site Area
Hectares allocated
SEZA
Zone Status
Qualifying development
2029
Operations
Target opening
Gateway to Southern Africa
Direct international flights connect Gaborone to Johannesburg, Nairobi, Addis Ababa and beyond. The airport SEZ location enables same-day patient transfers from across the SADC region.
SEZA Tax Advantages
As a SEZA-qualifying development, TEMCO benefits from significant fiscal incentives that improve project economics and patient affordability.
Corporate Tax
First 10 years, stepping up to 10% thereafter
TEMCO (SEZA)
5%
Standard
22%
Customs Duty
On imported medical equipment qualifying under SEZA
TEMCO (SEZA)
0%
Standard
Standard rates
Construction Timeline
From capital raise through to operations, a phased delivery programme targeting Q2 2029 opening.
Capital Raise and Design
Q1-Q3 2026Investor engagement, final architectural design, equipment specification and procurement planning.
Construction Commences
Q4 2026Site preparation, foundation works and structural construction at the SSKIA SEZ precinct.
Build and Fit-Out
2027-2028Structural completion, MEP installation, medical equipment commissioning and interior fit-out.
Commissioning
Q1 2029Medical equipment testing, staff onboarding, clinical protocol activation and JCI readiness assessment.
Operations Commence
Q2 2029Initial operations at 35% occupancy, ramping to full capacity over the first three years.
Delivery Model
TEMCO employs a project team-led delivery model, with an explicit opening for a strategic investor partner.
Engineering
In-House
Delivered in-house by the project team, led by Mr. Ben Olebile (Engineering Lead) and Lawrence Sebele (Lead Architect).
Procurement
Joint
The project team works jointly with approached contractors for materials and medical equipment sourcing, leveraging SEZA customs duty exemptions.
Management
Strategic Investor Opening
Project team-led, with an explicit opening for a strategic investor partner to bring hospital-sector operational experience alongside capital.
Invest in the Facility
A US$120M single-ticket investment in a 130-bed specialised tertiary facility at Gaborone Airport SEZ. Structure is open to investor proposal.